Urgent measures will be taken to address the existing problems in Mis-e Ainak project

firoz_admin
Wed, Sep 16 2020 12:34 PM
jjj

Acting Minister of Mines and Petroleum, Mohammad Haroon Chakhansuri met with the Chinese Ambassador to Kabul Mr. Wang Yu this morning in his office.

Both sides discussed China's projects in Afghanistan Extractive Industries sector, their support of the sector and the current status of Mis-e-Ainak project.

During the meeting, both sides committed to take urgent actions and solve the current problems in the Mis-e-Ainak project.

Latest news

Tue, Jun 17 2025 8:22 AM
Background image

د کانونو او پټرولیم وزارت او افچین شرکت تر منځ د آمو دریا نفتي حوزې تړون فسخه شو

د آمو دریا نفتي حوزې د اکتشاف او استخراج تړون چې د کانونو او پټرولیم وزارت او آفچین شرکت تر منځ د ۲۵ کلونو لپاره لاسلیک شوی و، د قراردادي شرکت له لوري د تړون له ژمنو څخه د پر له پسې. . .

Wed, May 03 2023 9:26 AM
Background image

A four-way coordination meeting for electricity generation from gas sources was held at the Ministry of Energy's Deputy Energy and Water Department.


   In this meeting, Honorable Engineer Diploma Wahidullah Halimi, Deputy Technical Minister of the Ministry of Mines and Petroleum, and Honorable Mullah Abdul Qahir Idris, Deputy. . .

BACK TO NEWS